PRO.TAK

For filling the seams of plasterboard
panels, reinforced concrete overlay
panels, smoothing larger
irregularities and
cracks of plasterboard panels,
plastered and other mineral
and wooden surfaces,
gluing seam tapes, paper,
paper metallized
and metal finishing corners,
gluing plasterboard panels.
For interior work.

Šios konfiguracijos produktų neturime
About product
Description

Field of use: for filling the seams of plasterboard panels, reinforced concrete overlay panels, smoothing larger irregularities and cracks of plasterboard panels, plastered and other mineral and wooden surfaces, gluing seam tapes, paper, paper metallized and metal finishing corners, gluing plasterboard panels. For interior work.

Properties: ready for use, elastic, reinforcing, excellent adhesion to the surface, weak, specific smell, very weak water absorption.

Surface preparation: Surfaces to be plastered must be clean, firm and dry. Remove adhesion-reducing substances - grease, grease, dust, glue, mortar residues, old peeling paint. Before filling, prime the surface with PRO GRUNTAS CONCENTRATE by diluting it with water in a ratio of 1:4.

Working conditions: the temperature of the base and the environment during work and drying must not be lower than +5°C, the optimal conditions for puttying are at a temperature of +20°C and 65% relative air humidity.

Work: Mix the putty well before use. Filling the joints of plasterboard/reinforced concrete overlay panels: use a putty spatula to fill the joint gap with putty and press the putty tape. After pressing the tape, smooth the surface with PRO TAK putty. Fill the dry joint prepared in this way with the help of a trowel with PRO putty UNIVERSAL and smooth it with the surface of the board.

Gluing the finishing corners: smear the surface of the corner with putty and press the finishing corner on it. Apply an additional layer of putty to the edges of the finishing corner and smooth it with a putty trowel.

Costs: when filling plasterboard seams ~0.3kg per meter of seam.

Drying time: at an air temperature of +20°C and a relative air humidity of 65%: fully hardens in 36 hours.

Cleaning tools: Wash tools with water immediately after work.

Storage and transport conditions: at a temperature not lower than +5°C and not higher than +30°C in a tightly

closed container. Protect from direct sunlight and freezing!

Environmental and occupational safety: Do not pour putty into drains, watercourses or soil. Avoid contact with eyes, skin or clothing. If swallowed, call a poison control and information office or seek medical attention immediately.

Keep out of reach of children.

EUH208 - May cause an allergic reaction.

Contains 1,2-benzisothiazol-3(2H)-one and 2,2',2''-

(Hexahydro-1,3,5-triazine-1,3,5-triyl)triethanol.